Leo Express has recently joined the FTE community as a new member. We wanted to use this occasion for a short interview with Jan Renc, Rolling Stock Manager at Leo Express. FTE is proud to see Jan Renc, a former FTE trainee, contributing to shape the railway sector in practice.
Jan, you have an expanding network. Could you briefly explain where Leo Express is currently operating and what are the new projects you are working on?
Jan Renc: Leo Express has already made significant steps in its international expansion in 2026, including new direct connections between Prague and Bratislava and the Przemyśl–Kraków–Prague–Dresden–Frankfurt service.
Another important milestone was the authorisation of the Talgo S6 trainsets for operation in the Czech Republic and Slovakia, a project which I had the opportunity to lead on behalf of Leo Express together with Renfe and our technical partners.
We are now preparing for the launch of the Ex36 Prague–Munich service and further development of our international operations. My team supports this expansion from the rolling-stock side – leading vehicle authorisations, procurements and technical implementation projects. My role is mainly to bring the right internal and external experts together, keep these complex projects moving and ensure that the vehicles are ready when the business needs them.
Why did Leo Express decide to join FTE? Was there a particular moment or reason behind that decision?
From my previous experience with FTE, I consider it a very effective platform connecting railway undertakings with developments at European level. It provides relevant information while giving operators a real opportunity to contribute to discussions with institutions such as the European Commission and RNE.
Leo Express joined both to learn from other railway undertakings and to contribute our own experience as a growing private and increasingly international operator. This is particularly relevant for topics such as capacity allocation, infrastructure management and commercial conditions, which directly influence our ability to plan reliable services.
Personally, I hope to contribute by bringing a practical RU perspective into these discussions. Working with both new rolling-stock projects and day-to-day operational requirements gives me a good view of how European-level decisions eventually translate into very concrete consequences for operators and passengers.
What do you think are the main issues or challenges in the European rail sector? And do you see an opportunity over the next decade to solve or mitigate them?
From my perspective, two of the biggest challenges are capacity and predictability. If Europe wants more passengers and freight to shift from road and air to rail, we need both sufficient infrastructure capacity and much better predictability of construction works and capacity allocation.
There is also considerable potential in increasing infrastructure speeds. In parts of Central Europe, average speeds remain around or even below 100 km/h. Not every line needs to become a high-speed line, but infrastructure managers should systematically identify sections where investments can progressively enable 160 or 200 km/h, while suitable European corridors should continue towards 250–300 km/h and beyond.
I believe infrastructure managers should increasingly be measured by outcomes relevant to operators and passengers: capacity, speed, reliability and predictability. Achieving this will require stable long-term financing and, where appropriate, PPP or other financing models that can help accelerate delivery.
In the area of FTE focus, namely capacity and traffic management, can you give some examples where the current framework and processes do not really support easy and customer-focused planning and operation of trains?
From the railway undertaking perspective, the fundamental requirement is stability. We need sufficient certainty about our paths to plan rolling stock, crews, maintenance and sales – and ultimately to provide passengers with a reliable product.
This is particularly important for Temporary Capacity Restrictions. Several relatively small restrictions on one line can accumulate into a significant delay, and the impact does not end when the train leaves the affected section. A delayed arrival can affect turnaround times and subsequent services, meaning that a relatively small initial delay may create a much larger operational and commercial impact later in the day.
Commercial conditions should therefore consider the complete requested line and the actual impact on the operator. Time and distance should preferably be evaluated continuously rather than through large artificial thresholds. The framework should also recognise that a 30-minute delay can have very different consequences depending on the service – for a passenger operator, for example, it can directly affect competitiveness against buses or cars.
This is an area where I would particularly like to contribute within FTE: translating operational experience into rules that create the right incentives for both infrastructure managers and railway undertakings. The objective should be simple – greater planning discipline, more predictable capacity and ultimately a more reliable railway for passengers.
Having previously been part of FTE as a Trainee early in your career and now being at an actual railway undertaking, has this changed your perspective on the sector?
Definitely. My time at FTE was one of the most important experiences at the beginning of my railway career. It gave me access to people with enormous experience and, perhaps more importantly, showed me how much there was still to learn.
Since then, I have progressed from being a trainee to managing rolling-stock projects and a team at a railway undertaking. I have tried to build that progression on being curious, listening to experts, taking responsibility when opportunities arise and learning from experience.
Working for an RU has also changed my perspective significantly. Topics discussed at European level can seem theoretical, but in daily operations they become very concrete: a train arrives late, a turnaround no longer works, rolling stock is in the wrong place or a passenger chooses another mode of transport.
I think my experience on both sides is therefore valuable. I understand the need for long-term European frameworks, but I also see the urgency and practical consequences for an operator trying to deliver trains every day. Connecting these two perspectives is something I would like to bring back to FTE as Leo Express becomes more actively involved.